Guaranteed Success in DCDC Certification DCDC-003.1 Exam Dumps [Q36-Q58]

Share

Guaranteed Success in DCDC Certification DCDC-003.1 Exam Dumps

BICSI DCDC-003.1 Daily Practice Exam New 2026 Updated 160 Questions

NEW QUESTION # 36
What is the Fourth Preference Regarding Utility Service?

  • A. Two balanced feeds with different voltages derived from a single distribution station
  • B. At least four circuits each from different distribution stations but fed via common feeders
  • C. At least two circuits from one substation fed via alternative power grid
  • D. One circuit from one substation, separate paths

Answer: D


NEW QUESTION # 37
what is the ANSI/TIA-942 typical range of pressure differential regarding positive pressure for data center.

  • A. Less than or equal to -0,1 in water column (-25 Pa)
  • B. More than -0,005 in wc (< -1,24 Pa), but less than or equal to +0,05in wc (+12,4 Pa)
  • C. More than +3in wc (>746Pa),but less than or equaltto+6,in wc(1492 pa))
  • D. Less Than -4,+4 inches water column(-1000 opa ,+100 <pa>)

Answer: A


NEW QUESTION # 38
where should engineering offices be located?

  • A. in a separate building
  • B. adjacent to equipment rooms they support
  • C. inside computer room
  • D. far away from the data center

Answer: B


NEW QUESTION # 39
What is the clearance required between cabinets and the perimeter wall?

  • A. 8 ft
  • B. 2 ft
  • C. 4 ft
  • D. 6 ft

Answer: C


NEW QUESTION # 40
What are the different generator ratings?

  • A. Prime, Continuous and Standby
  • B. Standard, Backup and Emergency
  • C. Normal, Redundant and Fault-tolerant
  • D. Primary, Secondary and Tertiary

Answer: A


NEW QUESTION # 41
What is the difference between N+1 and 2N redundancy?

  • A. N+1 redundancy is more flexible and adaptable to changing needs than 2N redundancy
  • B. N+1 redundancy means that there is one additional backup component while 2N redundancy means that there are two identical backup components
  • C. N+1 redundancy is more reliable than 2N redundancy
  • D. 2N redundancy is more cost-effective than N+1 redundancy

Answer: B


NEW QUESTION # 42
What is minimum recommended generator fuel storage amount?

  • A. enough to run 4 to 16 hours at full load
  • B. enough to run up-to a week at full load
  • C. enough to run 48-72 hours at full load
  • D. enough to run 24 to 36 hours at full load

Answer: C


NEW QUESTION # 43
What is the maximum recommended number of racks in an aisle?

  • A. 20 racks
  • B. 30 racks
  • C. 10 racks
  • D. 40 racks

Answer: A


NEW QUESTION # 44
What is the Typical Voltage Of A Utility Sub-Station?

  • A. High voltage at a stunningly high rate
  • B. Medium to Low-voltage range between 270 to13800 volts
  • C. Low voltage at 480 or less volts
  • D. The United States uses only Direct Currents DC

Answer: B


NEW QUESTION # 45
Which areas should generate a history of all access attempts and monitored by CCTV Security System?

  • A. Only computer rooms
  • B. Loading Docks
  • C. Computer rooms, Loading docks, storage areas, Staging areas and Vendor Storage
  • D. Storage Areas
  • E. Any concealed places

Answer: C


NEW QUESTION # 46
What is the recommended amount of fuel supply needing to be available to a class F3 data center?

  • A. 96 hours
  • B. 48 hours
  • C. 24 hours
  • D. 72 hours

Answer: D


NEW QUESTION # 47
what are the two rooms that may require 2 exits?

  • A. Equipment Room and Security Rooms
  • B. Water Supply Rooms
  • C. Mechanical Room and Electrical
  • D. the electrical Room and battery room
  • E. Computing rooms And Storage rooms

Answer: D

Explanation:
Explanation:


NEW QUESTION # 48
where should the secured storage area be located?

  • A. adjacent to the secured loading dock
  • B. None of above
  • C. adjacent to the non-secured loading dock
  • D. far away as possible from secure data
  • E. adjacent to security offices

Answer: A


NEW QUESTION # 49
What is the most common type of automatic transfer switch?

  • A. Delayed transition
  • B. Soft load transition
  • C. Closed transition
  • D. Open transition

Answer: D


NEW QUESTION # 50
How do you calculate the thermal load of the lighting system inside a data center?

  • A. Rated power * .02
  • B. Rated power * .05
  • C. Rated power * .01
  • D. IT load * .01
  • E. IT load * .02

Answer: A


NEW QUESTION # 51
What is the third preference regarding electricity supply?

  • A. One Balanced Feeder Coordinated With Upstream Backup Feed
  • B. Two Balanced Feeds With Same Voltage Derived From A Single Distribution Station
  • C. At Least Two Circuits From Same Power Grid But Different Substations And Separate Paths
  • D. One Circuit From Single Sub Station Fed Via Additional Path from Alternate Power Grid

Answer: C


NEW QUESTION # 52
where is the storage room located?

  • A. next door to computing area
  • B. Near Backup Generator
  • C. away from computer room, adjacent to equipment entrance at data center
  • D. outermost point of Data Centre
  • E. All

Answer: C


NEW QUESTION # 53
What is the NEBS GR-3028-CORE recommended operational temperature.

  • A. -20°F/-28° C minimum and up to a maximum of104 ° Fahrenheit/40° Celsius
  • B. -30°F to +110°F (-34°C to +43°C)
  • C. Up To140 Degrees Fahrenheit /60 Degrees Celsius
  • D. -25°F to +125°F (-32°C to +52°C)

Answer: A


NEW QUESTION # 54
What is the recommended range for the low temperature in a data center according to ASHRAE?

  • A. 70 degrees
  • B. 60 degrees
  • C. 64.4 degrees
  • D. 55 degrees
  • E. 75 degrees

Answer: C


NEW QUESTION # 55
Where should the entrance room be located within a data center?

  • A. In a separate building on the campus
  • B. Adjacent to or in a secured space within the computer room
  • C. In the computer room
  • D. Anywhere with easy access to the outside

Answer: B


NEW QUESTION # 56
How often is there typically a technology refresh in a data center?

  • A. Every 1-2 years
  • B. There is no typical refresh cycle
  • C. Every 3-5 years
  • D. Every 7-10 years

Answer: C


NEW QUESTION # 57
What are three primary considerations in designing the power systems space plan?

  • A. Energy utilization, efficiency of cooling and redundant generators
  • B. Physical security, environmental monitoring, backup power source
  • C. Reduce transmission loss, conduit path minimizing & spacing requirement for system
  • D. Leakage current control, firewall protection & hardening redundancy

Answer: C


NEW QUESTION # 58
......