SAP C-TS4CO-2020 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| Internal Orders 8% - 12% | Distinguish between order category and order type. Determine plan data, commitments and actual requirements for internal orders and determine period-end closing activities. Define, create and configure internal orders and create a concept for internal order accounting, and customize internal order accounting, determine settlement rules and configure period-end closing for IOA. |
| Reporting 8% - 12% | Determine general reporting requirements for cost centers, configure cost center reporting, and create report painter reports and drill-down reports. |
| Product Cost Planning > 12% | Determine and configure product cost planning, define interface from CO-PCP (Product Cost Planning) to CO-PA (Profitability Analysis) and costing versions for alternative costings, determine cost elements structure, cost component structure, planning requirements, costing variants and multi-level costings, and carry out a Price update in the material master record. |
| Organizational Assignments and Process Integration 8% - 12% | Define scopes and processes in Management Accounting, cross-company code design, sub-contracting, production execution, sales pricing, inbound freight, stock transfers, inventory valuation and transfer pricing, work in process rules and high-level requirements for organization units. Configure budgeting and availability control settings and period end closing, define statistical key figures and assign the controlling area to company codes and operating concern. Check number ranges and first integration flows with other modules (CO), and configure versions. |
| Profitability Analysis > 12% | Define value fields, characteristics and summary characteristics, determine planning, actual and process flow and security requirements, design process flows and develop authorization concept for reporting of FI / CO data. Configure profitability analysis and determine the operating concern, and assignment to controlling area. Define currency and assign the chart of accounts, result analysis and revenue recognition (in cooperation with FI and SD), and configure period-end closing for PA. |
| Cost Object Controlling > 12% | Determine and configure cost object controlling - planning and actuals, and customize and complete cost object controlling in a make to stock scenario and in a make to order scenario. Define WIP, results analysis, variances and revenue recognition (in cooperation with FI and SD) and configure period end closing for cost objects. |
| Cost Center Accounting > 12% | Define, create and configure cost centers, cost center hierarchies and cost center groups. Determine usage of Cost Center Accounting and type of planning functionality, cost center accounting activity types, cost center characteristics and attributes, planning requirements, plan allocations requirements and actual allocations for cost centers. Configure period end closing for CCA. |
| Profit Center Accounting < 8% | Create organizational charts for profit centers, determine Profit Centers (in FI in the new GL), create Profit Centers and check master data assignments, and configure period-end closing for PCA. |
C-TS4CO-2020 Exam Certification Details:
| Sample Questions: | SAP C-TS4CO-2020 Exam Sample Question |
| Duration: | 180 mins |
| Languages: | German, English, Russian |
| Exam: | 80 questions |
| Level: | Associate |
| Cut Score: | 64% |
NEW QUESTION 36
Plan revenue = 3000 Plan costs = 2000 Actual revenue = 1200 Actual costs = 1000
- A. Revenue 1500; Cost of sales = 1000; Revenue surplus = 300
- B. Revenue 1500; Cost of sales = 1000; Capitalized revenue (revenue in excess of billing) = 300
- C. Revenue 1500; Cost of sales = 1000; Revenue surplus = 200
- D. Revenue 1500; Cost of sales = 1000; Capitalized revenue (revenue in excess of billing) = 200
Answer: D
NEW QUESTION 37
Which object do you have to assign the cost component structure to?
- A. Material master record
- B. Costing variant
- C. Valuation variant
- D. Costing type
Answer: B
NEW QUESTION 38
You want to settle primary cost elements and secondary cost elements to different receivers. What do you use?
- A. Source structure
- B. PA transfer structure
- C. Overhead structure
- D. Allocation structure
Answer: A
NEW QUESTION 39
What can you manage via the account assignment category? 2 Answers
- A. Product cost by sales order
- B. Costing variant
- C. Separate sales order stock
- D. Valuated sales order stock
Answer: B,D
NEW QUESTION 40
You want to set up budget availability control for your projects and internal ordders. What can you check using budget availability control? 2 Answers
- A. The availability of funds using overall plan value
- B. The availability of funds in object currency
- C. The availability of funds on period level
- D. The availability of funds according to tolerance limits
Answer: B,D
NEW QUESTION 41
You want to use a template for activity and process assignment to your material cost estimate. What do you need to do ?
- A. Assign a template to an operation in the routing of the material
- B. Use the costing sheet of the costind view 1 in the template determination table
- C. Use the template allocation function in the material cost estimate and the costing run
- D. Assign a template directly to costing view 1 of the material master record
Answer: C
NEW QUESTION 42
Which characteristic of an internal order does the order type control?
- A. Types of costs posted to the order
- B. Time period for which the order is valid
- C. Budget profile assigned to the order
- D. Controlling areas the order is assigned to
Answer: C
NEW QUESTION 43
Which cost estimates must you reuse with the transfer control functionality?
- A. Cost estimates within the same plant
- B. Cost estimates with quantity structure
- C. Cost estimates across company codes
- D. Cost estimates with same cost component structure
Answer: D
NEW QUESTION 44
You need to analyze different planning scenarios for cost centers. With which object do you differentiate the planning scenarios?
- A. Company code
- B. CO version
- C. Operating concern
- D. Cost center group
Answer: B
NEW QUESTION 45
You want to use a template to consider overhead during product costing. How do you assign the template to your material?
- A. Using a special procurement type and an overhead group
- B. Using an overhead group and an overhead key
- C. Using a profit center and an overhead key
- D. Using an origin group and an overhead group
Answer: D
NEW QUESTION 46
You are posting a purchase order for a warehouse material. From which object is the profit center derived?
Response:
- A. Cost center
- B. Material master
- C. Business partner
- D. Plant
Answer: B
NEW QUESTION 47
You want to creat cost centers for you company. What is the prerequisite to building an organizational structure for overhead cost controlling?
- A. Cost center category
- B. Functional area
- C. Standard hierarchy top node
- D. Cost center type
Answer: C
NEW QUESTION 48
How can you configure cycles for period-end allocation? There are TWO correct answers for this question
- A. Create cycles that iterate with each other
- B. Use different allocation rules within one segment
- C. Define allocation for the same cost center in multiple segments
- D. Assign several segments to a cycle
Answer: C,D
NEW QUESTION 49
you are configuring internal order settlement. Where do you define which cost elements should be settled, using either the original or settlement cost elements?
- A. Settlement profile
- B. Allocation structure
- C. Template
- D. Settlement rule
Answer: B
NEW QUESTION 50
For which of the following situations would you need to implement the transfer price solution in SAP S4/HANA ?
- A. Parallel accounting is needed in order to be compliant with different accounting principles
- B. Parallel costing is needed in order to calculate separate costs of goods manufactured for different accounting principles
- C. Parallel price calculation and invoicing are needed to facilitate intercompany reconciliation
- D. Parallel valuation views of the same logistical flows are needed to differentiate between legal and profit center valuation
Answer: D
NEW QUESTION 51
What can you use to difference two or more cost estimates for the same material? There are TWO correct answers for this question
- A. Valuation variant
- B. Transfer control
- C. Costing variant
- D. Costing version
Answer: A,C
NEW QUESTION 52
Which objects can you plan in cost center accounting? There are THREE correct answers for this question
- A. Activity prices
- B. Secondary cost accounts
- C. Balance sheet accounts
- D. Statistical key figures
- E. Non-operating expense accounts
Answer: B,D,E
NEW QUESTION 53
......