NEW QUESTION 22

The following question requires your selection of CCC/CCE Scenario 2 (2.3.50.1.2) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
6,573 hours have been expended to date. Planned completion at this time is 60%. The project is determined to be 55% complete. How many hours have been earned?

  • A. 7,200
  • B. 6,573
  • C. 6,960
  • D. 6,600

Answer: B

 

NEW QUESTION 23
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
According to Maslow's hierarchy of needs, which level should be satisfied first?

  • A. Self-actualization
  • B. Safety needs
  • C. Physiological
  • D. Ego-status

Answer: C

 

NEW QUESTION 24
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
Which of the following percent complete measurement techniques is best suited for long-term non-production accounts (such as overhead accounts)?

  • A. Ratio/level of effort
  • B. Units completed
  • C. Start/finish
  • D. Incremental milestone

Answer: D

 

NEW QUESTION 25
AACE International defines _____________as a technique of economic evaluation that sums over a given study period, the costs of initial investment, replacements, operations, and maintenance/repair; expressed in either present or annual value terms.

  • A. Life cycle costs method (LCC)
  • B. Benefit/Cost ratio (B/C) method
  • C. Net present worth method
  • D. Risk analysis

Answer: A

 

NEW QUESTION 26
Money is value. Having money when you need it is very important. Money can also be valuable when used wisely by knowing when to spend and when to conserve Also, planning now for future expenses can be a plus to the company rather than a debit.
There are several ways to capitalize money and spending. Basically there is the single payment method that has a compound amount factor and a present worth factor. There is the uniform annual series that has a sinking fund factor, capital recovery factor and also the compound amount factor and present worth factor. At this point, we can assure money is worth 10%.
The following question requires your selection of CCC/CCE Scenario 7 (4.8.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
If the company needs to repay a loan of $100,000 in 10 uniform annual payments, how much will each payment be?

  • A. $15,937
  • B. $16,380
  • C. $16,578
  • D. $16,273

Answer: D

 

NEW QUESTION 27
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
Fred Fiedler's contingency model suggests that:

  • A. A relationship oriented leader described the least preferred worker in an unfavorable light
  • B. Successful leadership depends upon a good match
  • C. Successful leadership can always be imposed by experienced supervision
  • D. Leadership styles are just the opposite of the managerial grid model
  • E. between the style of the leader and the demands of the situation

Answer: E

 

NEW QUESTION 28
A contract clause that provides the owner with the right to terminate the contract irrespective of the general contractor's liability is:

  • A. Termination of contract - default
  • B. Breach of contract
  • C. Termination of contract - convenience
  • D. Substantial completion

Answer: C

 

NEW QUESTION 29

The following question requires your selection of CCC/CCE Scenario 4 (2.7.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
At the end of 30 months, copper prices will have increased by what percentage over today's price?

  • A. 6.6%
  • B. 3.5%
  • C. 2.5%
  • D. 4.6%

Answer: C

 

NEW QUESTION 30
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
Which of the following methods a used for creating critical path schedules:

  • A. Precedence diagram method
  • B. Precedence and arrow diagram methods only
  • C. Arrow diagram method
  • D. Gantt chart (bar chart) method

Answer: B

 

NEW QUESTION 31
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
After an individual's safety needs are met, what needs would the individual be motivated to fulfill next in Maslow's hierarchy of needs?

  • A. Self-actualization
  • B. Belonging needs
  • C. Knowledge
  • D. Pay and compensation

Answer: B

 

NEW QUESTION 32

The following question requires your selection of CCC/CCE Scenario 4 (2.7.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
At the end of Year 3, steel prices will have increased by what percentage over today's price? (round to 1 decimal)

  • A. 8.7%
  • B. 4.6%
  • C. 8.2%
  • D. 8.0%

Answer: D

 

NEW QUESTION 33

The following question requires your selection of CCC/CCE Scenario 6 (2.7.50.1.3) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
What is the relative frequency of unit costs from Atlanta, GA?

  • A. $40.59
  • B. $48.33
  • C. 33.33%
  • D. 0

Answer: C

 

NEW QUESTION 34
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
According to Maslow's hierarchy of needs, giving the employees an award that acknowledges their achievements is most likely to satisfy which level of need?

  • A. Belonging needs
  • B. Safety needs
  • C. Power needs
  • D. Self-actualization

Answer: D

 

NEW QUESTION 35
An agricultural corporation that paid 53% in income tax wanted to build a grain elevator designed to last twenty-five (25) years at a cost of $80,000 with no salvage value. Annual income generated would be $22,500 and annual expenditures were to be $12,000.
Answer the question using a straight line depreciation and a 10% interest rate.
The following question requires your selection of CCC/CCE Scenario 17 (4.2.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
Present worth calculations is represented by which of the following equations?

  • A. Option A
  • B. Option D
  • C. Option B
  • D. Option C

Answer: B

 

NEW QUESTION 36
Money is value. Having money when you need it is very important. Money can also be valuable when used wisely by knowing when to spend and when to conserve Also, planning now for future expenses can be a plus to the company rather than a debit.
There are several ways to capitalize money and spending. Basically there is the single payment method that has a compound amount factor and a present worth factor. There is the uniform annual series that has a sinking fund factor, capital recovery factor and also the compound amount factor and present worth factor. At this point, we can assure money is worth 10%.
The following question requires your selection of CCC/CCE Scenario 7 (4.8.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
If $20,000 is invested at the end of each fiscal year for the next 10 years, how much would our total investment be worth assuming the interest is at 10%?

  • A. $318,740
  • B. $265,798
  • C. $289,370
  • D. $420,236

Answer: A

 

NEW QUESTION 37

The following question requires your selection of CCC/CCE Scenario 28 (3.7.50.1.7) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
Given a unit price contract between the owner and contractor, each assumes the following:

  • A. Bid unit rate, owner quantities are within estimate range
  • B. Bid unit rate, owner quantities can exceed estimate range Contractor can perform above
  • C. Contractor can perform at or below bid unit rate, owner quantities are within estimate range
  • D. Contractor can perform at or below bid unit rate, owner quantities can exceed estimate range

Answer: C

 

NEW QUESTION 38

The following question requires your selection of CCC/CCE Scenario 6 (2.7.50.1.3) from the right side of your split screen., using the drop down menu, to reference during your response/choice of responses.
Calculate the weighted average unit cost.

  • A. $48.35
  • B. $48.09
  • C. $47.63
  • D. $46.13

Answer: A

 

NEW QUESTION 39
A systematic coding structure for organizing and managing scope, assets, cost, resources, work and schedule activity information is a______________.

  • A. Cost estimate classification
  • B. Code of accounts
  • C. Schedule identification number
  • D. Cost breakdown structure

Answer: B

 

NEW QUESTION 40

The following question requires your selection of CCC/CCE Scenario 4 (2.7.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
What is the cost index value of copper at the end of Year 2? (rounded to 2 decimal positions)

  • A. 4.31
  • B. 4.24
  • C. 4.10
  • D. 4.62

Answer: A

 

NEW QUESTION 41

The following question requires your selection of CCC/CCE Scenario 4 (2.7.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
At the end of 30 months, the final price for the piece of equipment will be:

  • A. $378,750
  • B. $328,810
  • C. $370,710
  • D. $375,658

Answer: D

 

NEW QUESTION 42

The following question requires your selection of CCC/CCE Scenario 28 (3.7.50.1.7) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
A reason for using a Construction Manager type agreement is:

  • A. To better coordinate contractors
  • B. Coordinate the owner and engineer as in Type A
  • C. To better coordinate contractors and subcontractors as in Type B
  • D. To better coordinate subcontractors

Answer: B

 

NEW QUESTION 43

The following question requires your selection of CCC/CCE Scenario 2 (2.3.50.1.2) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
9,375 hours have been expended to date. Planned completion at this time is 75%. The project is determined to be 66% complete. Based on current trends, how many hours will be expended at project completion?

  • A. 16,215
  • B. 14,201
  • C. 12,000
  • D. 10,526

Answer: D

 

NEW QUESTION 44
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
The project scheduler left the company and has left unfinished work. You have been hired as the new project scheduler and must update the existing schedule. What will be your first task?

  • A. Recalculate the early finish for each activity
  • B. Recalculate the critical path
  • C. Update the remaining duration for each activity
  • D. Recalculate the early start for each activity

Answer: B

 

NEW QUESTION 45
An agricultural corporation that paid 53% in income tax wanted to build a grain elevator designed to last twenty-five (25) years at a cost of $80,000 with no salvage value. Annual income generated would be $22,500 and annual expenditures were to be $12,000.
Answer the question using a straight line depreciation and a 10% interest rate.
If you buy a lot for $3,000 and sell it for $6,000 at the end of 8 years, what is your annual rate of return?

  • A. 10.4%
  • B. 9.1%
  • C. 9.9%
  • D. 8.3%

Answer: B

 

NEW QUESTION 46

The following question requires your selection of CCC/CCE Scenario 4 (2.7.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
If steel costs $1800/ton at the end of Year 3, what is the price of steel at the end of Year 4?

  • A. $1948/ton
  • B. $1836/ton
  • C. $1890/ton
  • D. $1863/ton

Answer: B

 

NEW QUESTION 47
......

Tested Material Used To CCP: https://www.actualtestsit.com/AACE-International/CCP-exam-prep-dumps.html