Oracle 1Z0-1075-21 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Describe Managerial Accounting Basics & Cost Accounting
  • Explain Work Order Reservations and History
Topic 2
  • Manage Production Calendars and add Shift and Work Center Resource exceptions
  • Describe how work definition is automatically generated
Topic 3
  • Explain Common Inventory Configurations
  • Describe Import Production Transactions
  • Describe Manufacturing Lead-time
Topic 4
  • Set up and implement Cost Planning estimates
  • Describe and Compute Production Costs
  • Explain Work Execution Work Areas
Topic 5
  • Explain Cost Reporting, including WIP Inventory Valuation Report
  • Configure Resources, Operations, and Work Centers
Topic 6
  • Create and update Work Orders for standard and non-standard Work Orders and Serialized Manufacturing
  • Set up Plant Parameters and Security, Profile Options, Lookups and DFFs
Topic 7
  • Execute Basic Transaction and Work Order Reporting
  • Explain Common Projects Enabled SCM Configurations
Topic 8
  • Describe Production Execution transactions (including Outside Processing)
  • Describe Functional Set Up Manager and Simplified Setup

 

NEW QUESTION 17
A manufacturing cloud user wants to print information available in the work order in PDF.
Identify the three reports that the user can print directly from the work order screen using the Print PDF action.

  • A. Print Component List
  • B. Work Order Traveler
  • C. Print Labels
  • D. Resource List
  • E. Bill of material

Answer: A,B,C

 

NEW QUESTION 18
A plantruns 24x7 daily using three continuous shifts of 8 hours each. One unit of an equipment resource R1 is assigned to each of the three shifts. On a specific work order, the resource R1 is required to work for 2 hours.
The resource is set up with an efficiency of 50% and utilization of 100%. R1 is scheduled to start on the given work order at noon.
What time will R1 be scheduled to finish, assuming no calendar exceptions have been set?

  • A. 2:00 PM
  • B. 1:00 PM
  • C. 8:00 PM
  • D. 4:00 PM
  • E. 12:30 PM

Answer: D

 

NEW QUESTION 19
Identify three requirements fulfilled by nonstandard work orders.

  • A. Repair
  • B. Prototype
  • C. Rework
  • D. Rescheduling

Answer: A,B,C

 

NEW QUESTION 20
A customer has a distribution warehouse (DW) for After Sales and Service and an in-house manufacturing plant (MP). Sales orders are created and shipped from DW.
Identify the two Sourcing Rules that need to be set for order promising to schedule the order.

  • A. Define Local sourcing rule for organization MP: Source Type Make At, Source MP
  • B. Define Local sourcing rule for organization DW: Source Type Make From, Source MP
  • C. Define Local sourcing rule for organization DW: Source Type Transfer From, Source MP
  • D. Define Local sourcing rule for organization MP: Source Type Transfer To, Source DW

Answer: A,C

 

NEW QUESTION 21
The Manufacturing Engineer, responsible for creating and maintaining the Work Definitions, hasscheduled the Process Item Structure Changes to Work Definitions program. However, after the execution of the program the engineer did not receive a notification with the details of the Item Structure changes.
Which two reasons could cause this?

  • A. The engineer does not have the Manage Work Definitions function privilege.
  • B. The engineer does not have Data access to Items.
  • C. The engineer does not have Data access to Items Attributes.
  • D. The engineer does not have Data access to Manufacturing plant in which the Item Structure change was performed.
  • E. The engineer does not have Dataaccess to Item Structures.

Answer: A,D

 

NEW QUESTION 22
Identify three entities that must be set up in Oracle Manufacturing Cloud to create a Work Definition for an item that will be manufactured in-house.

  • A. Resources
  • B. Production Line
  • C. Operations
  • D. Operation Items
  • E. Manufacturing Lead Time

Answer: A,C,D

 

NEW QUESTION 23
In a manufacturing plant, the work definition and rate plans of Material, Resource, and Overhead of an assembly have been defined as required.
A cost accountant created different scenarios to represent different manufacturing and cost assumptions and compare the results. When the cost assumptions are finalized, the cost accountant is expected to publish the cost scenario to cost accounting.
Identify three process steps that the cost accountant has to perform to transferthe assembly to cost accounting in frozen type.

  • A. Create Accounting Distributions.
  • B. Build cost planning scenario and perform cost roll up.
  • C. Transfer Transactions from Inventory to Costing.
  • D. Transfer transactions from production to Costing.
  • E. Define acost planning scenario with Material, Resource, Overhead cost plans, and work definition.
  • F. Publish cost planning scenario to Accounting.

Answer: A,C,E

 

NEW QUESTION 24
Identify thetwo capabilities that the Application Development Framework Desktop Integration (ADFDI) framework provides for Work Definitions in Manufacturing Cloud.

  • A. You can mass create and update work definitions and their operations only and cannot add items and resources in work definitions.
  • B. You can mass create and update work definitions and their operations, items, and resources.
  • C. You can copy work definitions form one organization to another organization.
  • D. You can mass create and update work definitions and their operations, items only and cannot add resources in work definitions.

Answer: B,C

 

NEW QUESTION 25
You arereviewing the production status of your manufacturing plant shop floor as a production supervisor.
Your production manager wants a report on a work order status which is reserved against a particular customer. The final assembly of the work order is serialized.
Which option shows the steps to complete the task using the mobile application?

  • A. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode to open the work order details page > Click Actions and select the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient's e-mail, and click Send.
  • B. Select the infotile Customer to open the work order details page> Click Actions and select the E-mail icon> Select required work orders>Select the e-mail client, enter the recipient's e-mail, and click Send.
  • C. Search the work order by customer name to open the work order details page> Click Actions and select the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient's e-mail, andclick Send.
  • D. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode to open the work order details page> Select required work orders> Click Social icon (OSN) > Select recipient, and click Share.

Answer: A

 

NEW QUESTION 26
The Plant Manager informs you that they have bought several machines for their manufacturing plant ABC.
The plant has been set up with a separate cost element set ABC in Manufacturing Cloud. You are requested to configure these machines in such a way that those are costed to the work order for which operations are performed on these machines.
Identify the correct setup that you will advise to the Plant Manager.

  • A. Set up the machines as cost element type of "Resource" by selecting Cost Element set Common.
  • B. Set up the machines as cost element type of "Resource" by selecting Cost Element set ABC.
  • C. Set up the machines as cost element type of "Overhead" by selecting Cost Element set Common.
  • D. Set up the machines as cost element type of "Overhead" by selecting Cost Element set ABC.

Answer: A

 

NEW QUESTION 27
Identify four parameters that are considered in the calculation of manufacturing lead time in Oracle Manufacturing Cloud.

  • A. The primary work definition of the item
  • B. The lot size of the item
  • C. The shifts are defined in the plant calendar
  • D. Resource calendars of the work centers involved
  • E. Resource calendar exceptions
  • F. Plant calendar exceptions

Answer: A,B,C,E

 

NEW QUESTION 28
Your customer has defined the work definitions. They have created and saved a new version for the work definition and want to edit that work definition.
Which two attributes cannot be updated using the Edit Work Definition Details action?

  • A. Version
  • B. Production Priority
  • C. CostingPriority
  • D. State Date

Answer: A,D

 

NEW QUESTION 29
As part of an implementation project, you have to perform setups related to a Manufacturing plant in Functional Setup Manager.
What must be set up first in order for you to configure the setup task called Manage Plant Parameters?

  • A. The Manage product and Child Value Sets task
  • B. The Supply Chain Orchestration Functional Area
  • C. The Manufacturing Master Data Functional Area
  • D. The Manage Items Profile Options tasks

Answer: C

 

NEW QUESTION 30
Identify the two configurations in Supply Chain cloud applications of Product Information Management (PIM) and Order promising (GOP), which must be set to process the Back-to-Back order with Make Supply Order, for a nonstocked item.

  • A. Create Supply Chain Orchestration Supply Execution Document Creation Rule for the nonstocked item.
  • B. Set the nonstocked item to be back-to-back enabled in Product Information Management (PIM).
  • C. Set a local sourcing rule in GOP to determine supply creation option as Make.
  • D. Create Supply Order Orchestration Defaulting and Enrichment Rule for the nonstocked item.
  • E. Set the global sourcing rule in GOP to determine supply creation option as Make.

Answer: B,E

 

NEW QUESTION 31
A Production Operator needs to load Work Order Transactions from an external system into Manufacturing Cloud.
Identify the correct sequence of tasks to be performed.

  • A. Export File to UCM server> Load Data to Fusion repository> Process Import Operations Transactions> Load file from UCM to Interface table.
  • B. Load Data to Fusion repository> Export File to UCM server > Load file from UCM to Interface table
    >Process Import Operations Transactions.
  • C. Load Data to Fusion repository> Load File from UCM to Interface table> Export File to UCM server> Process Import Operations Transactions.
  • D. LoadData to Fusion repository> Export File to UCM server > Process Import Operations Transactions> Load file from UCM to Interface table.

Answer: A

 

NEW QUESTION 32
In a manufacturing plant, a production operator in a givenshift completes a car assembly and reports this using orderless completion by referencing a Work Definition.
Identify the two purposes of the referenced Work Definition in Orderless reporting.

  • A. Resource usage
  • B. Return material
  • C. Material usage
  • D. Processing steps
  • E. Scrap material

Answer: A,C

 

NEW QUESTION 33
Your customer wants to mass create and modify Work Definitions and the relevant operation, items, and resources available in the spreadsheet.
Which two operations are not supported using ADFDI (Oracle Application Development Framework Desktop Integration)?

  • A. Create Work Definitions
  • B. Update Work Definitions
  • C. Populate Descriptive flexfields
  • D. Create and update ATO (Assemble To Order) model work definitions

Answer: C,D

 

NEW QUESTION 34
A production operator needs to review the materials issued, resources charged, and operations performed for a job that was executed inthe previous shift.
Identify the task the operator has to select to review all the transactions in a single place for both Work Order and Orderless execution.

  • A. Report Resource, Material and OperationTransactions
  • B. Review Dispatch List
  • C. Manage Work Orders
  • D. Review Production Transaction History

Answer: C

 

NEW QUESTION 35
You are monitoring the production status on your shop floor. The production operator informs you that a particular resource that was not functioning for the past week is now back in operation.
Which option shows the steps to quickly release the work orders affected by this operation, which were put on hold using the mobile application?

  • A. Select the infotile On Hold> Select a work order you want to release> Swipe left on the work ordername> Tap or click the Release action, and click OK
  • B. Select the infotile Unreleased> Select a work order you want to release>Swipe left on the work order name> Tap or click the Release action, and click OK
  • C. Select the infertile Dispatch List> Select awork order operation you want to release> Swipe left on the work order name> Tap or click the Release action, and click OK
  • D. Select the infotile On Hold> Select awork order you want to release> Select the work order operation on hold > Swipe left on the work order name> Tap or click the Release action, and click OK

Answer: C

 

NEW QUESTION 36
A Production operator in your company is required to report production activities, suchas completing or scrapping production units, by referencing a work definition without creating work orders.
Identify the manufacturing transaction that a production operator can perform for reporting such activities.

  • A. Operation Transactions
  • B. Movement request
  • C. Resource Transactions
  • D. Material Transactions
  • E. Orderless Transactions

Answer: E

 

NEW QUESTION 37
Your customer hasthe following business requirement. There are two work definitions created in the application. One Work Definition for Engine Finished Good and other Work Definition for Pallet Finished Good. The Engine Finished Good item should have Pallet Finished Goodsas one of its component.
Identify the way to establish the relationship between Pallet and Engine Work Definitions.

  • A. Create a Subinventory that could be the completion Subinventory for yielding the pallet and then the same Subinventory can serve as the supply Subinventory of the pallet in the Work Definition created for Engine.
  • B. The two Work Definitions can be tied through Projector Seiban numbers.
  • C. Assign a higher priority to the Work Definition created for Engine and a lower one for the Work Definition for Pallet.
  • D. The Work Definition versions can be used to tie the Work Orders.

Answer: D

 

NEW QUESTION 38
During a Manufacturing Cloud implementation, the customer request to develop Oracle Transactional Business Intelligence reports that are not available out-of- the box.
Identify the tool that is available to the Report Developer in Manufacturing Cloud to develop the reports.

  • A. Oracle Business Intelligence Enterprise Edition
  • B. Oracle Business Intelligence Publisher
  • C. Oracle Business Intelligence Standard Edition
  • D. Oracle Business Intelligence Application

Answer: B

 

NEW QUESTION 39
A user wants to transfer the work order status updates and resource transaction data for costed resources to Cost Management.
Whichscheduled process should you run to achieve this requirement?

  • A. Transfer General Ledger Balances to Balance Cubes
  • B. Transfer Ledger Balances
  • C. Transfer Transactions to Costing
  • D. Transfer Cost to Cost Management

Answer: D

 

NEW QUESTION 40
Work order costs are computed based on material and resource transactions reported and the cost method of the product. In a manufacturing plant, the production operator has completed a work order WO-001 ensuring proper materials and resource transactions. The materials are costed and resources are defined with rates.
A cost accountant has created cost accounting distributions. Upon reviewing the accounting distributions of the work order WO-001, resources charged to the work order are missing.
Identify the Concurrent Request that needs to be submitted to transfer resource charges to cost accounting.

  • A. Transfer Costs to Cost Management
  • B. Create accounting
  • C. Transfer Transactions from Inventory to Costing
  • D. Transfer Transactions from Production to Costing

Answer: D

 

NEW QUESTION 41
A manufacturing plant works for two shifts of 8 hours each. The Manufacturing user wants a work center resource R1 of 4 units to be available during a nonworking time outside the regular shift on a particular day.
Identify the sequence of steps to create a resource exception in the Manage Work Center Resource Calendar page.

  • A. Click Inside the existing Shift time on a Specific Date>Create Work Center page>Click the Resource Availability tab>Click Add icon> Select R1 from Resource Drop-down list> Enter4 in Default Units Available.
  • B. Click Outside the existing Shift time on a Specific Date> Create Work Center page> Click the Resource Availability tab> Click Add icon> Select R1 from Resource Drop-down list> Enter 4 in Default Units Availability column.
  • C. Click Outsidethe existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability and Overrides Region> Populate 4 units in Availability Override column.
  • D. Click Inside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability region> Populate 4 units inDefault Availability column.

Answer: C

 

NEW QUESTION 42
......

1Z0-1075-21 Sample with Accurate & Updated Questions: https://www.actualtestsit.com/Oracle/1Z0-1075-21-exam-prep-dumps.html