[Nov-2023] E_S4HCON2023 exam torrent SAP study guide [Q42-Q63]

Share

[Nov-2023] E_S4HCON2023 exam torrent SAP study guide

Use Valid New E_S4HCON2023 Test Notes & E_S4HCON2023 Valid Exam Guide

NEW QUESTION # 42
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:

  • A. SWPM using the Backup / Restore procedure
  • B. SUM without DMO
  • C. SWPM using the Load procedure
  • D. SUM with DMO

Answer: C


NEW QUESTION # 43
During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this?
There are 2 correct answers to this question.
Response:

  • A. Check for running R31oad processes on the host of the primary application server
  • B. Check for running batch jobs in the shadow system via Job Overview (SM37)
  • C. Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
  • D. Check for running R3trans processes on the host of the primary application server

Answer: C,D


NEW QUESTION # 44
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?

  • A. AA
  • B. A Standalone SAP system with ABAP 7.51 or above
  • C. An SAP S4HANA 1709 sandbox system

Answer: B,C


NEW QUESTION # 45
The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?
There are 2 correct answers to this question.
Response:

  • A. Check the system log (transaction SM21) of the SAP system
  • B. Check the messages shown by the SUM UI
  • C. Check the most recent entries in SAPup.log
  • D. Check the most recent entries shown in file sapevt.trc

Answer: B,C


NEW QUESTION # 46
You are running an SAP ECC system.
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities?
Note There are 3 correct answers to this question

  • A. Use DMO for SUM
  • B. Perform an SAP S/4 HANA conversion without DMO
  • C. Upgrade the SAP system
  • D. Apply SAP support packages
  • E. Perform an SAP S/4 HANA conversion including DMO

Answer: A,C,D


NEW QUESTION # 47
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.

  • A. Post-downtime
  • B. During uptime
  • C. During SPDD
  • D. During downtime

Answer: A,B


NEW QUESTION # 48
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:

  • A. Dedicated application tables are migrated in uptime
  • B. TABIMJJPG is executed in uptime
  • C. An additional temporary database is used during uptime
  • D. The repository is migrated in uptime

Answer: A


NEW QUESTION # 49
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:

  • A. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
  • B. Activation of dictionary objects in phase ACT_UPG
  • C. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
  • D. Import of dictionary objects from the download directory in phase DDIC_UPG
  • E. Import of upgrade and language data from the download directory in phase TABIM UPG

Answer: B,D,E


NEW QUESTION # 50
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC
6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:

  • A. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
  • B. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU
    &UC) procedure.
  • C. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
  • D. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.

Answer: D


NEW QUESTION # 51
You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?

  • A. After SUM has ended
  • B. Before the start of the SUM technical downtime
  • C. During the SUM technical downtime
  • D. During the Execution roadmap step

Answer: C


NEW QUESTION # 52
Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?

  • A. Silent data migration (SDM)
  • B. Shadow on target creation
  • C. Downtime migration
  • D. Downtime conversion

Answer: C


NEW QUESTION # 53
Which are valid options to check the progress of the database migration in a Microsoft Windows environment?
There is correctanswers to this question.
Response:

  • A. Check the dump size of the database export on disk
  • B. Check the "Charts Control Center" in the SUM UI
  • C. Check the log files written under "SUM\abap\log"
  • D. Check logs for jobs starting with "RSUPG_SGEN" in the system

Answer: B,C


NEW QUESTION # 54
You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?

  • A. The end of the database migration
  • B. The start of the business downtime
  • C. The start of the Execution roadmap step
  • D. The end of the business downtime

Answer: D


NEW QUESTION # 55
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?

  • A. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.
  • B. AA

Answer: A


NEW QUESTION # 56
During the upgrade of your development system, you run into the adjustment of non-dictionary objects handled by transaction SPAU There you find programs that are shown in status "automatic adjustment (green traffic tight). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?

  • A. Before continuing with the next phase SUM asks for a modification adjustment transport
  • B. SUM continues with the next phase and your modifications are lost
  • C. SUM refuses to continue unless you have marked a transport request as modification adjustment transport
  • D. SUM continues with the next phase and your modifications are kept as In the start release

Answer: D


NEW QUESTION # 57
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
Please choose the correct answer.
Response:

  • A. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.
  • B. An SAP S/4HANA conversion is performed, without adapting the customer data.
  • C. An upgrade of the software components is performed, without changing the database type.
  • D. A change of the database type is performed, without changing the software components.

Answer: D


NEW QUESTION # 58
What do you do to prepare the database migration option of a SUM procedure?
There are 3 correct answers
Response:

  • A. Move the SAPM update archive into the download folder
  • B. Extract the SAP HANA database installation archive
  • C. Move the stack.xml update file into the download folder
  • D. Move the R3trans update archive into the download folder
  • E. Extract the SAP HANA client installation archive

Answer: A,C,E


NEW QUESTION # 59
What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.

  • A. It explains the database migration option (DMO) of SUM.
  • B. It contains a section about the simplification item (SI) checks.
  • C. It is a database-specific document.
  • D. It explains where to find information about the custom code analysis.

Answer: B,D


NEW QUESTION # 60
Which of the following are valid options to check the progress of an inplace SUM DMO run? Note There are 2 correct answers to this question

  • A. Check the log files written in the SUM directory subdirectory abap. subdirectory log
  • B. Check logs for jobs starting with RSUPG_SGEN in the SAP system.
  • C. Check the dump size of the database export on disk.
  • D. Check the Charts Control Center in the SUM Ul

Answer: A,C


NEW QUESTION # 61
During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison?
Please choose the correct answer.
Response:

  • A. It performs a comparison on selected tables using check sum.
  • B. It performs a comparison on all tables using row counts.
  • C. It performs a comparison of all tables using check sum.
  • D. It does NOT perform any table comparison.

Answer: B


NEW QUESTION # 62
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:

  • A. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
  • B. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
  • C. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
  • D. After the SUM roadmap step "Postprocessing" and post procedure steps are finished

Answer: C


NEW QUESTION # 63
......

E_S4HCON2023 Exam questions and answers: https://www.actualtestsit.com/SAP/E_S4HCON2023-exam-prep-dumps.html

E_S4HCON2023 Actual Questions Answers PDF 100% Cover Real Exam Questions: https://drive.google.com/open?id=1jJwtaljLFK4SwtMD317Oz3vbpf8Hwjgv